Use
Use this tool for fast preliminary engineering estimates before detailed equipment selection.
Preliminary kVAr compensation needed to move from current power factor to a target value.
Better power factor can reduce apparent power demand and improve electrical system utilization.
No. Harmonics, switching method and utility rules should be checked before equipment selection.